§7 · Using the module
Analytical accounting
For management controllers. The Analytics section lets you allocate entries to cost centres and projects, then follow their trial balance and ledger.
Analytical › Analytical allocations
Analytical › Overview
| Menu entry | Role |
| Analytics overview | Expenses allocated by cost centre, project consumption, unallocated entries, allocation rate. |
| Analytical allocations | Allocate an entry across sections. |
| Analytical ledger | Detailed movements of a section. |
| Analytical trial balance | Expenses, revenue and balance by section. |
| Analytical plans & sections | Create and manage sections (cost centres, projects). |
Understanding analytical accounting and its axes
What is an analytical section?
Whereas general accounting classifies expenses and revenue by nature (for example account 601 for raw-material purchases, 605 for supplies, 661 for salaries), analytical accounting classifies the same flows by destination.
An analytical section is a management unit of your company to which you want to attach costs or revenue to measure its profitability or its budget consumption.
In Fleuva, sections are organised into two families (or axes):
ACCOUNTING EXPENSE (e.g. 1,000,000 XOF)
│
┌─────────────────────────┴─────────────────────────┐
▼ ▼
AXIS 1: COST CENTRE AXIS 2: PROJECT
(Permanent structure) (Temporary operation)
"Who incurred the expense?" "For what purpose?"
e.g. North workshop (60%) / South (40%) e.g. Riviera bridge site Cost centre vs project: what is the difference?
| Feature | Axis 1: Cost centre (structural) | Axis 2: Project (operational) |
| Question asked | WHO consumes the resource? Which department or service is responsible? | WHAT FOR is the resource consumed? On which site or customer contract? |
| Lifetime | Permanent (company organisation chart). | Temporary (defined project start and end). |
| Requirement | Always mandatory on every allocation line. | Optional / complementary (filled in only when the expense concerns a specific project). |
| Examples | General management, production workshop, Lomé branch, sales department, IT. | Riviera bridge site, Solar energy project 2026, Consulting mission for customer Alpha. |
Double tagging: why an expense is never counted twice
Managers often worry that an amount will be counted twice if it is allocated to both a centre and a project.
infoFundamental rule: a real expense leaves the cash only once. Analytical allocation does not create new money; it simply applies two different analysis tags to the same accounting document.
Example
You receive a technical expertise invoice of 1,000,000 XOF.
You assign it to the Technical department cost centre (the department that carries the expertise budget).
You also allocate it to the Riviera bridge site project (the expertise was carried out for that customer site).
- 1
The Technical department centre report shows a consumption of 1,000,000 XOF.
- 2
The cost report of the Riviera bridge site includes this cost of 1,000,000 XOF.
- 3
In general accounting, the total expense remains exactly 1,000,000 XOF.
You never add cost-centre totals to project totals: they are two independent, complementary views of the same economic reality.
Step by step
Step 1: Create or edit an analytical section
To organise your analytical plan:
- 1
In the navigation bar, go to Analytics › Analytical plans & sections.
- 2
You see the list of all existing sections, sorted by code.
- 3
To add a section, click New Section: · Code: a short, meaningful identifier (e.g. CC-ADM for Administration, PRJ-EXP for Expansion project). · Label: full name of the section. · Axis: you must choose between Cost Center and Project. · Responsible: name of the manager or project manager in charge of the section. · Active: leave it ticked so that the section is offered when allocating entries.
- 4
Click Save. The section is immediately available throughout the application.
Step 2: Allocate an entry from the dashboard
When a purchase invoice or a miscellaneous-operations entry is validated, it automatically appears in analytical tracking.
Dashboard ──▶ Click "Allocate →" ──▶ Allocation grid ──▶ 100% validation
- 1
Open the analytical dashboard (menu Analytics › Analytics overview).
- 2
At the bottom of the page, check the Recent Unallocated Entries table.
- 3
Find the entry to process and click the blue Allocate → link (you can also open the full grid at any time through Analytics › Analytical allocations).
- 4
The Analytic Entry window opens with the accounting line preloaded (document, expense account, amount).
- 5
In the allocation grid, fill in: · The Cost Center (mandatory on every line). · The Project (if the expense applies to a project; otherwise leave it empty). · The % Allocation: for example 60 % on centre A and 40 % on centre B. The amount is calculated automatically.
- 6
Check that the control bar shows a total of 100 %.
- 7
Click Validate Allocation (or save as a draft if you are waiting for details).
As soon as it is validated, the document disappears from the list of pending entries and immediately feeds the analytical ledger and trial balance.
Step 3: View and analyse the analytical trial balance
The analytical trial balance gives the overall financial summary of each section for the fiscal year.
- 1
Go to Analytics › Analytical trial balance.
- 2
The filter at the top right lets you show: · All Axes (complete overview). · Cost Center only (structural / departmental view). · Project only (site profitability view).
- 3
For each section, the trial balance shows: · Charges: total expenses allocated to the section. · Revenues: total revenue or re-invoicing allocated. · Balance: difference between revenue and expenses. A positive balance appears in green (surplus / profit margin) and a negative balance in red (net cost borne by the company).
- 4
The Detail → link on the right of a row takes you straight to that section's ledger.
Step 4: Justify a section in the analytical ledger
The analytical ledger is the detailed audit document:
- 1
Go to Analytics › Analytical ledger.
- 2
Select the section you want in the drop-down list (e.g. Workshop Alpha or Riviera bridge site).
- 3
You find, line by line: · The date and the original accounting document number. · The description of the operation and the general account used (e.g. 601100). · The exact amount allocated to this section. · The running total of expenses and revenue.
Understanding the indicators and the "Unallocated" line
On the analytical dashboard, four cards show the health of your management accounting:
| Card / indicator | What it measures | What this figure means for the finance director |
| Allocated Expenses | Total amount already allocated to a cost centre. | Volume of activity already analysed and under control for the fiscal year. |
| Consumed on Projects | Total expenses attached to specific projects. | Consolidated budget tracking of ongoing sites and contracts. |
| Unallocated | Amount of expenses recorded in general accounting but not yet allocated to a cost centre. | Amount to process urgently. Shows the work left to have up-to-date analytical accounts. |
| Allocation Rate | Ratio in % = (allocated expenses / total expenses of the fiscal year). | Target: 100 %. The closer this rate is to 100 %, the more reliable your cost prices and margins. |